Kitchen revamp - 5

Once the concrete has hardened and we can walk on it, I can think about the positioning of the lights.  I'll be using standard 50 Watt spots, mounted in the plasterboard ceiling, and the cabling has to be in place before the plasterboard goes up.  Julian, my brother-in-law, has put up spots in their kitchen and I asked his advice on spacing, etc.

There are two beams in the kitchen, and in the gaps they create I've planned for three rows of spots, with 3-2-3 lights to the rows, to get an even light distribution.  I found it remarkably difficult to get everything in the right place.  Lines that were supposed to be straight were not, and I was up and down the ladder like a yo-yo correcting this or that error.   In the end I think I got it OK.  The wires are laid out where they are supposed to be, and the spot positions are marked with string hanging down.

And since it's a good idea with electrical things, to check it as you go along, I suspended a bulb from time to time to check that all was well.


Thursday, 31 October 2013

Kitchen revamp - 4

The new kitchen won't occupy the entire space available: an area will be separated off with a plasterboard wall to form a small utility room that will house the water heater, the washing machine, a toilet and hand-basin.  Before the concrete goes down, we just need to re-position the soil pipe to take the toilet in its new position.  Cut the old pipe, then glue the new one in, testing different angle joints and pipe lengths to get the connection in the right place (we hope).  A bit of a race against the concrete tide, but done in good time.


Eventually, the floor is covered.  (The blue pipe you can see hanging from the wall is the temporary feed of cold water to the old kitchen to keep it going during the upheaval.)

Wednesday, 30 October 2013

Kitchen revamp - 3

After the walls were knocked down and the basic shape of the new kitchen sorted out, we needed to get the plumbing done.  I decided it would be a good opportunity to put in an outside standpipe too, so at the same time as we put in the sink drain, we threaded a plastic pipe (blue) through the same hole.


The water supply to the sink (hot and cold) will also serve to supply the dishwasher, and is fed through two plastic pipes from the main riser in the cupboard.  The conduits for this and the conduits for the electricity feeds were laid out on the floor, on top of the new insulation, ready for concreting over.

At this point I get a bit jittery, since any mistakes are set in concrete, literally.  I suppose that in the worst case, I could pass a conduit over the ceiling behind the plasterboard, but I would really, really prefer not to have to do that.


And so, we're ready for concrete.

Sunday, 27 October 2013

Butterflies on Sedum

The kitchen project is taking most of my time at the moment, so here's a few pictures of some butterflies that were gorging themselves on some Sedum in the garden a few weeks ago.  The pictures are a bit blurry, but that's because the butterflies didn't stay still, even when I asked them nicely.



Thursday, 24 October 2013

Kitchen revamp - 2

Once the rooms are empty, we can start to knock down the walls.  Looks a bit like a Schwarzenegger has been here with his "I'll be back" promise, or someone was in a desperate hurry to get to the toilet still hidden behind the far wall.


And so, eventually we got the walls down, and the builders started digging up the floor.  We had some difficulty here.  Exactly what aspect of "don't drill through the electric cables or the water pipes to the kitchen" do you not understand?


Sunday, 20 October 2013

Kitchen revamp - 1

The kitchen in our house here has never been particularly nice to use, and was old and tatty when we moved in 8 years ago.  So we decided it really was about time we did something about it.

The ground floor is split into 6 rooms including the hallway.  On the right as you walk in the front door is the living room, first on the left is the door to the kitchen then second on the left is the door that leads to a small downstairs bathroom/utility room and on to the office (was designed to be a bedroom).  In front of you as you walk in is a door to a tiny toilet.  The office/bedroom is much bigger than the kitchen and it was our friend Leo who suggested that we could install a kitchen in the office to get a bigger one.  Good idea.

First stage is to empty out the office and the utility room (that also stores a lot of my tools and gear), and to distribute the desks, filing cabinets and whatnot around the house.  Here is a couple of views of the empty office room.  In the second picture, the bathroom/utility room is behind the interior wall and to the left of the corridor that leads on into the living room.


The first job will be to knock down the internal walls and then clear out the cupboards and bath from the bathroom, and take the toilet out too.   (Anyone want a cast iron bath?  Needs re-enamelling).


Dishwasher-Pis

Not as good as the Manneken-Pis, but it's mine.