Well the DIY project started in February is still ongoing, with some progress having been made. The sliding doors are in, and the vertical dividers inside the cupboards are in place, as are some shelves, sliding drawer/baskets, and hanging rails.
The old doors have had a lick of paint, though the curvy top looks out of place and will probably get changed.
The floor remains to be done.
Thursday, 9 March 2017
Subscribe to:
Post Comments (Atom)
1 comment:
Hang in there, it will get built. And if your build it, they will come.
Post a Comment