Tuesday, 26 January 2010

Project - phase 3

The next phase of the project, once the floor has been leveled, is to put down the insulation and then lay out the pipes and heat conductors. The floor is then ready for the concrete.

6 comments:

Tim Trent said...

How many times do you test it before you pour the concrete?

And do you wonder, just after you've started the pour, if you should just test it again?

Mark In Mayenne said...

Hi Tim, it is being held under a pressure of ten atmospherse for 48 hours. I hope that will be enough.....

Jonathan said...

Those metal pieces for spreading the heat... I had imagined they would be universal rather than just here and there. Is there a reason for that other than the obvious cost?

Mark In Mayenne said...

Hi Jonathan, when the system is installed on a 1st floor, the heat guides cover the whole surface. However, when a concrete screed is poured on top of such a surface, the danger is that it delaminates over time. So the guides cover around 1/2 to 1/3 of the area, so that the concrete can better stick around them.

The bike shed said...

Just doing something similar in my house in Wales - though laying slate over. We can compare notes on how effective it is!

Mimi Lenox said...

It looks like a cathedral wall from here.

Related Posts Plugin for WordPress, Blogger...